IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0291 # 02 Y:2005 02 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $18,138 $19,073 Not Implemented
UM0291 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,293 $9,000 Implemented
UM0291 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,841 $1,490 Not Implemented
UM0291 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $396 $150 Not Implemented
UM0291 # 07 Y:2005 07 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,325 $1,265 Implemented
UM0291 # 03 Y:2005 03 2005 COVER OPEN TANKS $4,518 $2,366 Implemented
UM0291 # 06 Y:2005 06 2005 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $2,309 $39,000 Not Implemented
UM0291 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,427 $1,900 Implemented
MS0283 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,251 $69,379 Not Implemented
MS0283 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,662 $81,973 Not Implemented
MS0283 # 06 Y:2005 06 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,320 $236 Not Implemented
MS0283 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $402 $556 Not Implemented
MS0283 # 07 Y:2005 07 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,316 $2,025 Not Implemented
MS0283 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,338 $247 Implemented
MS0283 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $401 $1,066 Not Implemented
MS0283 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,008 $50,375 Implemented
MS0283 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,965 $3,192 Not Implemented
IC0109 # 01 Y:2005 01 2005 MODIFY WORKLOAD $25,000 $0 Implemented
IC0109 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,496 $2,100 Implemented
IC0109 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $37,809 $131,160 Not Implemented
IC0109 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $1,239 $400 Implemented
IC0109 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,632 $22,464 Not Implemented
IC0109 # 03 Y:2005 03 2005 REPLACE BOILER $294,938 $501,372 Not Implemented
IC0109 # 02 Y:2005 02 2005 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $437,212 $3,259,200 Not Implemented
UM0289 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $859 $2,663 Not Implemented