Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
268
matching recommendationsNAICS | 33631 | Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CL2016 # 05 Y:2020 | 05 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $967 | $400 | Not Implemented |
CL2016 # 06 Y:2020 | 06 | 2020 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $797 | $0 | Implemented |
CL2016 # 07 Y:2020 | 07 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $567 | $0 | Implemented |
CL2016 # 08 Y:2020 | 08 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,055 | $2,500 | Implemented |
UD1000 # 09 Y:2019 | 09 | 2019 | INSTALL OCCUPANCY SENSORS | $1,925 | $8,061 | Implemented |
UD1000 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,801 | $81,000 | Implemented |
UD1000 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,280 | $0 | Implemented |
UD1000 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,606 | $0 | Not Implemented |
UD1000 # 03 Y:2019 | 03 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,599 | $0 | Implemented |
UD1000 # 04 Y:2019 | 04 | 2019 | USE OPTIMUM THICKNESS INSULATION | $2,318 | $290 | Not Implemented |
UD1000 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,102 | $0 | Not Implemented |
UD1000 # 06 Y:2019 | 06 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $71,143 | $12,480 | Not Implemented |
UD1000 # 07 Y:2019 | 07 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,374 | $48,748 | Not Implemented |
TT0205 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $376,439 | $20 | Implemented |
TT0205 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $376,439 | $1,600 | Not Implemented |
TT0205 # 03 Y:2018 | 03 | 2018 | METER WASTE WATER | $30,463 | $1,000 | Not Implemented |
TT0205 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $28,188 | $132,000 | Not Implemented |
TT0205 # 06 Y:2018 | 06 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $9,911 | $10,800 | Not Implemented |
TT0205 # 07 Y:2018 | 07 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,761 | $8,362 | Not Implemented |
TT0205 # 08 Y:2018 | 08 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $5,176 | $6,900 | Not Implemented |
TT0205 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,941 | $160 | Not Implemented |
IP0084 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,221 | $290 | Implemented |
IP0084 # 10 Y:2017 | 10 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $238 | $125 | Not Implemented |
IP0084 # 09 Y:2017 | 09 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $910 | $416 | Not Implemented |
IP0084 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,534 | $928 | Not Implemented |