IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
NAICS 33631 Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1060 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $300 $952 Implemented
UD1060 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,251 $772 Not Implemented
UD1060 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,987 $912 Not Implemented
UD1060 # 06 Y:2023 06 2023 OPTIMIZE PLANT POWER FACTOR $2,184 $2,800 Not Implemented
UD1060 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $653 $0 Not Implemented
UD1060 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $139 $0 Implemented
UD1060 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,544 $17,274 Implemented
UD1060 # 07 Y:2023 07 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $892 $1,613 Not Implemented
UD1000 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $1,925 $8,061 Implemented
UD1000 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,606 $0 Not Implemented
UD1000 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,801 $81,000 Implemented
UD1000 # 07 Y:2019 07 2019 RECOVER WASTE HEAT FROM EQUIPMENT $24,374 $48,748 Not Implemented
UD1000 # 06 Y:2019 06 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $71,143 $12,480 Not Implemented
UD1000 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,102 $0 Not Implemented
UD1000 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,280 $0 Implemented
UD1000 # 03 Y:2019 03 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,599 $0 Implemented
UD1000 # 04 Y:2019 04 2019 USE OPTIMUM THICKNESS INSULATION $2,318 $290 Not Implemented
UD0682 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,025 $1,000 Implemented
UD0682 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,790 $3,000 Implemented
UD0682 # 11 Y:2003 11 2003 INSTALL OCCUPANCY SENSORS $366 $428 Not Implemented
UD0682 # 03 Y:2003 03 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,300 $11,000 Not Implemented
UD0682 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $27,255 $5,000 Not Implemented
UD0682 # 07 Y:2003 07 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $4,800 $2,000 Implemented
UD0682 # 10 Y:2003 10 2003 DISCONNECT BALLASTS $1,534 $116 Not Implemented
UD0682 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,809 $47,488 Not Implemented