Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsNAICS | 33631 | Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1060 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $300 | $952 | Implemented |
UD1060 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,251 | $772 | Not Implemented |
UD1060 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,987 | $912 | Not Implemented |
UD1060 # 06 Y:2023 | 06 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,184 | $2,800 | Not Implemented |
UD1060 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $653 | $0 | Not Implemented |
UD1060 # 01 Y:2023 | 01 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $139 | $0 | Implemented |
UD1060 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,544 | $17,274 | Implemented |
UD1060 # 07 Y:2023 | 07 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $892 | $1,613 | Not Implemented |
UD1000 # 09 Y:2019 | 09 | 2019 | INSTALL OCCUPANCY SENSORS | $1,925 | $8,061 | Implemented |
UD1000 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,606 | $0 | Not Implemented |
UD1000 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,801 | $81,000 | Implemented |
UD1000 # 07 Y:2019 | 07 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,374 | $48,748 | Not Implemented |
UD1000 # 06 Y:2019 | 06 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $71,143 | $12,480 | Not Implemented |
UD1000 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,102 | $0 | Not Implemented |
UD1000 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,280 | $0 | Implemented |
UD1000 # 03 Y:2019 | 03 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,599 | $0 | Implemented |
UD1000 # 04 Y:2019 | 04 | 2019 | USE OPTIMUM THICKNESS INSULATION | $2,318 | $290 | Not Implemented |
UD0682 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,025 | $1,000 | Implemented |
UD0682 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,790 | $3,000 | Implemented |
UD0682 # 11 Y:2003 | 11 | 2003 | INSTALL OCCUPANCY SENSORS | $366 | $428 | Not Implemented |
UD0682 # 03 Y:2003 | 03 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,300 | $11,000 | Not Implemented |
UD0682 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,255 | $5,000 | Not Implemented |
UD0682 # 07 Y:2003 | 07 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,800 | $2,000 | Implemented |
UD0682 # 10 Y:2003 | 10 | 2003 | DISCONNECT BALLASTS | $1,534 | $116 | Not Implemented |
UD0682 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,809 | $47,488 | Not Implemented |