IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
NAICS 336310 Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2016 # 05 Y:2020 05 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $967 $400 Not Implemented
CL2016 # 06 Y:2020 06 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $797 $0 Implemented
CL2016 # 07 Y:2020 07 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $567 $0 Implemented
CL2016 # 08 Y:2020 08 2020 RECOVER WASTE HEAT FROM EQUIPMENT $4,055 $2,500 Implemented
UD1000 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $1,925 $8,061 Implemented
UD1000 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,801 $81,000 Implemented
UD1000 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,280 $0 Implemented
UD1000 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,606 $0 Not Implemented
UD1000 # 03 Y:2019 03 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,599 $0 Implemented
UD1000 # 04 Y:2019 04 2019 USE OPTIMUM THICKNESS INSULATION $2,318 $290 Not Implemented
UD1000 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,102 $0 Not Implemented
UD1000 # 06 Y:2019 06 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $71,143 $12,480 Not Implemented
UD1000 # 07 Y:2019 07 2019 RECOVER WASTE HEAT FROM EQUIPMENT $24,374 $48,748 Not Implemented
TT0205 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $376,439 $20 Implemented
TT0205 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $376,439 $1,600 Not Implemented
TT0205 # 03 Y:2018 03 2018 METER WASTE WATER $30,463 $1,000 Not Implemented
TT0205 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $28,188 $132,000 Not Implemented
TT0205 # 06 Y:2018 06 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $9,911 $10,800 Not Implemented
TT0205 # 07 Y:2018 07 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,761 $8,362 Not Implemented
TT0205 # 08 Y:2018 08 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $5,176 $6,900 Not Implemented
TT0205 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,941 $160 Not Implemented
IP0084 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,221 $290 Implemented
IP0084 # 10 Y:2017 10 2017 APPLY FOR INVESTMENT INCENTIVES $238 $125 Not Implemented
IP0084 # 09 Y:2017 09 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $910 $416 Not Implemented
IP0084 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,534 $928 Not Implemented