Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
224
matching recommendationsNAICS | 33632 | Motor Vehicle Electrical and Electronic Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0783 # 11 Y:2008 | 11 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,659 | $600 | Not Implemented |
UD0783 # 12 Y:2008 | 12 | 2008 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,581 | $500 | Not Implemented |
UD0783 # 13 Y:2008 | 13 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $970 | $1,000 | Not Implemented |
UD0783 # 14 Y:2008 | 14 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $844 | $500 | Not Implemented |
UD0783 # 15 Y:2008 | 15 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $837 | $400 | Not Implemented |
TT0017 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $13,583 | $1,715 | Not Implemented |
TT0017 # 02 Y:2008 | 02 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $302 | $324 | Not Implemented |
TT0017 # 03 Y:2008 | 03 | 2008 | OPTIMIZE PLANT POWER FACTOR | $1,370 | $5,170 | Not Implemented |
TT0017 # 04 Y:2008 | 04 | 2008 | INSTALL SKYLIGHTS | $12,995 | $22,450 | Not Implemented |
TT0017 # 05 Y:2008 | 05 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,947 | $17,385 | Not Implemented |
MS0283 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,251 | $69,379 | Not Implemented |
MS0283 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,662 | $81,973 | Not Implemented |
MS0283 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,008 | $50,375 | Implemented |
MS0283 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,338 | $247 | Implemented |
MS0283 # 05 Y:2005 | 05 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,965 | $3,192 | Not Implemented |
MS0283 # 06 Y:2005 | 06 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,320 | $236 | Not Implemented |
MS0283 # 07 Y:2005 | 07 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,316 | $2,025 | Not Implemented |
MS0283 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $402 | $556 | Not Implemented |
MS0283 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $401 | $1,066 | Not Implemented |
OK0699 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,780 | $6,150 | Implemented |
OK0699 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $8,145 | $24,175 | Implemented |
OK0699 # 03 Y:2004 | 03 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,446 | $23,400 | Implemented |
OK0699 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,440 | $18,681 | Implemented |
OK0699 # 05 Y:2004 | 05 | 2004 | INSTALL SET-BACK TIMERS | $6,489 | $3,960 | Implemented |
OK0699 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $418 | $520 | Implemented |