IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
Reset
NAICS 336330 Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1908 # 13 Y:2019 13 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,547 $8,300 Implemented
UK1908 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,676 $22,903 Implemented
UK1908 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $116,074 $438,000 Implemented
UK1908 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,319 $0 Implemented
UK1908 # 15 Y:2019 15 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $63,247 $2,368 Implemented
UK1908 # 17 Y:2019 17 2019 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $1,430 $0 Implemented
UD0997 # 01 Y:2019 01 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,924 $0 Implemented
UD0997 # 02 Y:2019 02 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,364 $0 Implemented
UD0997 # 10 Y:2019 10 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,439 $164,220 Implemented
NC0626 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,034 $135 Implemented
NC0626 # 07 Y:2019 07 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,977 $200 Implemented
NC0626 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,564 $40,273 Implemented
TT0209 # 11 Y:2018 11 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $465 Implemented
TT0209 # 01 Y:2018 01 2018 CLEAN CONDENSER TUBES $14,316 $600 Implemented
TT0209 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,088 $2,000 Implemented
TT0209 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $5,280 Implemented
MA0787 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,111 $100 Implemented
MA0787 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $660 $100 Implemented
MA0787 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,796 $100 Implemented
MA0787 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,589 $100 Implemented
IP0083 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $13,276 $7,860 Implemented
IP0083 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $15,077 $1,296 Implemented
IP0083 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,706 $0 Implemented
TT0192 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175,487 $344,898 Implemented
TT0192 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,730 $18,400 Implemented