IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

246

matching recommendations
Reset
NAICS 336330 Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2208 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,464 $422 Not Implemented
UL2208 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,079 $9,418 Not Implemented
UL2208 # 04 Y:2022 04 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,853 $0 Not Implemented
UL2208 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $58,141 $745,985 Not Implemented
IP0151 # 01 Y:2021 01 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $759 $18 Implemented
IP0151 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,626 $271 Implemented
IP0151 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $2,159 $767 Implemented
IP0151 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,612 $34,884 Implemented
IP0151 # 05 Y:2021 05 2021 REPLACE BOILER $26,645 $57,558 Implemented
UK1908 # 06 Y:2019 06 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,551 $0 Implemented
UK1908 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $553 $227 Not Implemented
UK1908 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,190 $3,038 Implemented
UK1908 # 07 Y:2019 07 2019 DISCONNECT BALLASTS $383 $72 Implemented
UK1908 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,319 $0 Implemented
UK1908 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,676 $22,903 Implemented
UK1908 # 08 Y:2019 08 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $914 $720 Not Implemented
UK1908 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $116,074 $438,000 Implemented
UK1908 # 18 Y:2019 18 2019 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $21,879 $28,230 Not Implemented
UK1908 # 17 Y:2019 17 2019 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $1,430 $0 Implemented
UK1908 # 13 Y:2019 13 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,547 $8,300 Implemented
UK1908 # 14 Y:2019 14 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,671 $2,684 Not Implemented
UK1908 # 11 Y:2019 11 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $13,831 $5,000 Not Implemented
UK1908 # 16 Y:2019 16 2019 INSULATE BARE EQUIPMENT $13,639 $18,226 Not Implemented
UK1908 # 15 Y:2019 15 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $63,247 $2,368 Implemented
UK1908 # 12 Y:2019 12 2019 CLEAN CONDENSER TUBES $15,832 $7,858 Implemented