IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 336330 Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0083 # 02 Y:2017 02 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $15,779 $5 Not Implemented
TT0192 # 10 Y:2017 10 2017 DEVELOP A REPAIR/REPLACE POLICY $796 $1,453 Not Implemented
TT0192 # 09 Y:2017 09 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,309 $10,000 Not Implemented
TT0192 # 08 Y:2017 08 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $3,741 $8,000 Not Implemented
TT0192 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,001 $3,000 Not Implemented
TT0192 # 06 Y:2017 06 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,000 $20,000 Not Implemented
TT0192 # 05 Y:2017 05 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,432 $9,000 Not Implemented
TT0192 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,492 $11,000 Not Implemented
TT0192 # 03 Y:2017 03 2017 INSTALL TIMERS AND/OR THERMOSTATS $7,986 $5,250 Not Implemented
TT0192 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,730 $18,400 Implemented
TT0192 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175,487 $344,898 Implemented
IP0083 # 10 Y:2017 10 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,250 $5,000 Not Implemented
IP0083 # 11 Y:2017 11 2017 OPTIMIZE PLANT POWER FACTOR $8,640 $34,900 Not Implemented
IP0083 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $25,016 $5 Implemented
IP0083 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $3,290 $0 Implemented
IP0083 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,706 $0 Implemented
IP0083 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $20,472 $1,434 Not Implemented
IP0083 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $15,077 $1,296 Implemented
IP0083 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $13,276 $7,860 Implemented
IP0083 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,581 $23,044 Implemented
IP0083 # 09 Y:2017 09 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,902 $3,417 Implemented
UK1612 # 13 Y:2017 13 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,400 $422 Not Implemented
UK1612 # 12 Y:2017 12 2017 INSULATE BARE EQUIPMENT $1,083 $1,584 Not Implemented
UK1612 # 11 Y:2017 11 2017 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,333 $0 Not Implemented
UK1612 # 04 Y:2017 04 2017 INSTALL SKYLIGHTS $9,639 $11,580 Not Implemented