IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

361

matching recommendations
Reset
NAICS 33635 Motor Vehicle Transmission and Power Train Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0236 # 03 Y:2020 03 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,481 $0 Implemented
IC0236 # 04 Y:2020 04 2020 USE RADIANT HEATER FOR SPOT HEATING $7,794 $18,280 Not Implemented
IC0236 # 05 Y:2020 05 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $77,665 $110,000 Not Implemented
IC0236 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,626 $4,075 Implemented
IC0236 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,304 $100 Not Implemented
UK1916 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,602 $2,270 n/a
UK1916 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,402 $2,614 n/a
UK1916 # 05 Y:2019 05 2019 AIR CONDITION ONLY SPACE NECESSARY $4,922 $11,550 n/a
UK1916 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $195 $75 n/a
UK1916 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,394 $25,674 n/a
UK1916 # 02 Y:2019 02 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $18,894 $0 n/a
UK1916 # 01 Y:2019 01 2019 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $1,170 $0 n/a
UK1916 # 09 Y:2019 09 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $86,132 $206,000 n/a
UK1916 # 08 Y:2019 08 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,946 $0 n/a
UK1916 # 10 Y:2019 10 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $139,706 $225,000 n/a
UD0984 # 01 Y:2018 01 2018 USE OPTIMUM THICKNESS INSULATION $2,053 $50 Not Implemented
UD0984 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,566 $1,500 Implemented
UD0984 # 10 Y:2018 10 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,271 $21,975 Not Implemented
UD0984 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,474 $11,000 Implemented
UD0984 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,981 $14,930 Implemented
UD0984 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $852 $750 Implemented
UD0984 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,616 $10,000 Implemented
UD0984 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,684 $0 Implemented
UD0984 # 07 Y:2018 07 2018 USE RADIANT HEATER FOR SPOT HEATING $42,420 $47,500 Not Implemented
UD0984 # 08 Y:2018 08 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $22,981 $69,925 Not Implemented