IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 33637 Motor Vehicle Metal Stamping
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0043 # 07 Y:2023 07 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $54 $51 Implemented
MU0043 # 06 Y:2023 06 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,803 $28,063 Implemented
MU0043 # 05 Y:2023 05 2023 KEEP EQUIPMENT CLEAN $33 $0 Implemented
MU0043 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $228 $480 Implemented
MU0002 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,292 $1,250 Implemented
MU0002 # 01 Y:2022 01 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,933 $0 Implemented
MU0002 # 08 Y:2022 08 2022 USE RADIANT HEATER FOR SPOT HEATING $1,961 $3,045 Implemented
MU0002 # 07 Y:2022 07 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $17,145 $16,000 Implemented
MU0002 # 06 Y:2022 06 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $47,027 $242,692 Implemented
MU0002 # 05 Y:2022 05 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $701 $0 Implemented
MU0002 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $1,113 Implemented
UM0451 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $16,165 $25,000 Implemented
UM0451 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $6,320 $4,800 Implemented
UM0448 # 02 Y:2014 02 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,310 $500 Implemented
UM0448 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,336 $2,500 Implemented
UM0424 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,204 $1,000 Implemented
UM0424 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,695 $1,600 Implemented
UM0424 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,312 $750 Implemented
UM0408 # 02 Y:2012 02 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,324 $2,000 Implemented
UM0408 # 06 Y:2012 06 2012 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,364 $0 Implemented
UM0408 # 05 Y:2012 05 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $595 $100 Implemented
UM0408 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,021 $1,500 Implemented
UM0408 # 07 Y:2012 07 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,129 $1,000 Implemented
UM0407 # 06 Y:2012 06 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $480 $100 Implemented
UM0407 # 03 Y:2012 03 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,006 $8,000 Implemented