Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
507
matching recommendationsNAICS | 336370 | Motor Vehicle Metal Stamping |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0424 # 04 Y:2013 | 04 | 2013 | USE MORE EFFICIENT ADHESIVE APPLICATORS | $44,144 | $40,000 | Not Implemented |
UM0424 # 05 Y:2013 | 05 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,695 | $1,600 | Implemented |
UA3023 # 01 Y:2012 | 01 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $90,505 | $55,107 | Not Implemented |
UA3023 # 02 Y:2012 | 02 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $27,110 | $2,162 | Not Implemented |
UA3023 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $9,242 | $680 | Not Implemented |
UA3023 # 04 Y:2012 | 04 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,914 | $180 | Implemented |
UA3023 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $28,652 | $2,400 | Not Implemented |
UA3023 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,924 | $9,695 | Not Implemented |
UA3023 # 07 Y:2012 | 07 | 2012 | DISCONNECT BALLASTS | $6,783 | $1,013 | Implemented |
UA3023 # 08 Y:2012 | 08 | 2012 | DISCONNECT BALLASTS | $4,820 | $810 | Implemented |
UA3023 # 09 Y:2012 | 09 | 2012 | DISCONNECT BALLASTS | $3,927 | $810 | Implemented |
UA3023 # 10 Y:2012 | 10 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,216 | $430 | Not Implemented |
UM0408 # 01 Y:2012 | 01 | 2012 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $13,566 | $16,700 | Not Implemented |
UM0408 # 02 Y:2012 | 02 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $10,324 | $2,000 | Implemented |
UM0408 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,021 | $1,500 | Implemented |
UM0408 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,447 | $200 | Not Implemented |
UM0408 # 05 Y:2012 | 05 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $595 | $100 | Implemented |
UM0408 # 06 Y:2012 | 06 | 2012 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $1,364 | $0 | Implemented |
UM0408 # 07 Y:2012 | 07 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,129 | $1,000 | Implemented |
UM0407 # 01 Y:2012 | 01 | 2012 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,773 | $15,000 | Not Implemented |
UM0407 # 02 Y:2012 | 02 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,427 | $2,000 | Implemented |
UM0407 # 03 Y:2012 | 03 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $6,006 | $8,000 | Implemented |
UM0407 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,966 | $200 | Not Implemented |
UM0407 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,660 | $1,500 | Implemented |
UM0407 # 06 Y:2012 | 06 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $480 | $100 | Implemented |