IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

507

matching recommendations
Reset
NAICS 336370 Motor Vehicle Metal Stamping
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2404 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,250 $840 n/a
UL2404 # 06 Y:2024 06 2024 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $5,809 $43,234 n/a
UL2404 # 03 Y:2024 03 2024 INSTALL SPECTRAL REFLECTORS / DELAMP $1,516 $0 n/a
UL2404 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,084 $419 n/a
UL2404 # 08 Y:2024 08 2024 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $24,490 $4,200 n/a
UL2404 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $5,080 $13,000 n/a
MU0043 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $18,979 $158,490 Not Implemented
MU0043 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $228 $480 Implemented
MU0043 # 08 Y:2023 08 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,395 $128,601 Not Implemented
MU0043 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,957 $2,281 Not Implemented
MU0043 # 06 Y:2023 06 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,803 $28,063 Implemented
MU0043 # 05 Y:2023 05 2023 KEEP EQUIPMENT CLEAN $33 $0 Implemented
MU0043 # 07 Y:2023 07 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $54 $51 Implemented
MU0043 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,700 $7,887 Not Implemented
MU0043 # 01 Y:2023 01 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $116 $319 Not Implemented
AM0887 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,300 $0 Not Implemented
AM0887 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $912 $1,783 Implemented
AM0887 # 06 Y:2023 06 2023 USE SYNTHETIC LUBRICANT $860 $440 Not Implemented
AM0887 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,340 $850 Implemented
AM0887 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,360 $303 Implemented
AM0887 # 03 Y:2023 03 2023 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $3,790 $8,650 Not Implemented
AM0887 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,830 $1,000 Implemented
MS0417 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,912 $3,171 Not Implemented
MS0417 # 02 Y:2023 02 2023 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,264 $21,500 Not Implemented
MS0417 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,886 $2,761 Implemented