IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

507

matching recommendations
Reset
NAICS 336370 Motor Vehicle Metal Stamping
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0548 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,227 $82,355 Not Implemented
IA0548 # 02 Y:2015 02 2015 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $17,173 $8,320 Not Implemented
IA0548 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,596 $700 Not Implemented
IA0548 # 04 Y:2015 04 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,432 $23,803 Not Implemented
IA0548 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,809 $140 Not Implemented
IA0548 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,746 $60 Not Implemented
IA0548 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,065 $2,700 Not Implemented
IA0548 # 08 Y:2015 08 2015 USE PHOTOCELL CONTROLS $408 $2,000 Not Implemented
WV0511 # 01 Y:2015 01 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $34,159 $150,000 Not Implemented
WV0511 # 02 Y:2015 02 2015 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $19,864 $40,000 Not Implemented
WV0511 # 03 Y:2015 03 2015 UPGRADE CONTROLS ON COMPRESSORS $16,424 $20,442 Not Implemented
WV0511 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,254 $2,007 Implemented
WV0511 # 05 Y:2015 05 2015 REDUCE VENTILATION AIR $14,480 $15,000 Not Implemented
WV0511 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,417 $15,818 Implemented
WV0511 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,476 $0 Implemented
WV0511 # 08 Y:2015 08 2015 FILTER AND REUSE HYDRAULIC OIL $9,274 $12,449 Not Implemented
WV0511 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $6,429 $15,050 Not Implemented
WV0511 # 10 Y:2015 10 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,475 $618 Implemented
WV0511 # 11 Y:2015 11 2015 DEVELOP A REPAIR/REPLACE POLICY $1,478 $677 Implemented
WV0511 # 12 Y:2015 12 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $759 $30 Implemented
WV0511 # 13 Y:2015 13 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $500 $1,000 Implemented
UK1501 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $2,481 $2,300 Not Implemented
UK1501 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,106 $0 Not Implemented
UK1501 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,967 $500 Implemented
UK1501 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,186 $7,500 Not Implemented