IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,252

matching recommendations
Reset
NAICS 33639 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0147 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $320 $100 Not Implemented
UA0147 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $539 $2,535 Not Implemented
UA0147 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $278 $225 Implemented
UA0143 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,525 $16,630 Not Implemented
UA0143 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,099 $800 Implemented
UA0143 # 03 Y:2015 03 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,022 $25,000 Not Implemented
UA0143 # 04 Y:2015 04 2015 OPTIMIZE PLANT POWER FACTOR $1,140 $2,140 Not Implemented
UA0143 # 05 Y:2015 05 2015 USE PHOTOCELL CONTROLS $458 $959 Not Implemented
UA0143 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,799 $40 Implemented
WV0500 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,981 $10,019 Implemented
WV0500 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,178 $4,647 Implemented
WV0500 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,013 $20 Implemented
WV0500 # 04 Y:2015 04 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,650 $0 Not Implemented
WV0500 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,477 $0 Implemented
WV0500 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,390 $11,630 Not Implemented
WV0500 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $516 $542 Implemented
UD0914 # 01 Y:2014 01 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,542 $8,700 Not Implemented
UD0914 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,836 $5,325 Not Implemented
UD0914 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $436 $400 Not Implemented
UD0914 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,381 $0 Implemented
UD0914 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,264 $5,000 Not Implemented
UD0914 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,960 $5,000 Not Implemented
UD0914 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,276 $82,980 Implemented
UD0914 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $79,150 $211,525 Not Implemented
UD0914 # 09 Y:2014 09 2014 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,388 $0 Not Implemented