Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,252
matching recommendationsNAICS | 33639 | Other Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0630 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,074 | $6,924 | Not Implemented |
UD0904 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,181 | $0 | Implemented |
UD0904 # 02 Y:2014 | 02 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,875 | $0 | Implemented |
UD0904 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $3,359 | $450 | Implemented |
UD0904 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,024 | $5,000 | Implemented |
UD0904 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $33,689 | $62,131 | Not Implemented |
UD0904 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,892 | $0 | Implemented |
UD0904 # 07 Y:2014 | 07 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $777 | $384 | Not Implemented |
UD0904 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $66,236 | $75,700 | Implemented |
UD0904 # 09 Y:2014 | 09 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,039 | $0 | Not Implemented |
UD0904 # 10 Y:2014 | 10 | 2014 | USE OPTIMUM THICKNESS INSULATION | $16,866 | $20,982 | Implemented |
UD0904 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,786 | $10,400 | Implemented |
UD0904 # 12 Y:2014 | 12 | 2014 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $96,196 | $72,000 | Not Implemented |
UD0904 # 13 Y:2014 | 13 | 2014 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $69,423 | $62,000 | Not Implemented |
UD0904 # 14 Y:2014 | 14 | 2014 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $47,628 | $1,300 | Not Implemented |
MZ0137 # 01 Y:2014 | 01 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,036 | $0 | Not Implemented |
MZ0137 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $1,989 | $1,920 | Implemented |
MZ0137 # 03 Y:2014 | 03 | 2014 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $856 | $2,050 | Implemented |
MZ0137 # 04 Y:2014 | 04 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,610 | $0 | Implemented |
MZ0137 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $805 | $1,475 | Implemented |
MZ0137 # 06 Y:2014 | 06 | 2014 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $8,378 | $0 | Implemented |
MZ0137 # 07 Y:2014 | 07 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $4,215 | $0 | Not Implemented |
MZ0137 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,678 | $7,200 | Not Implemented |
IA0514 # 01 Y:2014 | 01 | 2014 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $18,117 | $82,200 | Not Implemented |
IA0514 # 02 Y:2014 | 02 | 2014 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,046 | $55,230 | Not Implemented |