Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,252
matching recommendationsNAICS | 33639 | Other Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0079 # 05 Y:2004 | 05 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,450 | $720 | Implemented |
TA0079 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $637 | $0 | Not Implemented |
TA0079 # 07 Y:2004 | 07 | 2004 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $280 | $0 | Implemented |
WI0474 # 01 Y:2004 | 01 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $213,585 | $150 | Implemented |
WI0474 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,878 | $44 | Implemented |
WI0474 # 03 Y:2004 | 03 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $22,030 | $17,000 | Not Implemented |
WI0474 # 04 Y:2004 | 04 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $21,301 | $39 | Implemented |
WI0474 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,940 | $790 | Not Implemented |
WI0474 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,067 | $785 | Not Implemented |
MI0085 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,514 | $2,300 | Implemented |
MI0085 # 02 Y:2004 | 02 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $21,699 | $1,200 | Implemented |
MI0085 # 03 Y:2004 | 03 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $868 | $0 | Not Implemented |
MI0085 # 04 Y:2004 | 04 | 2004 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $1,834 | $130 | Implemented |
MI0085 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $-19 | $2,670 | Implemented |
MI0085 # 06 Y:2004 | 06 | 2004 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $20,000 | $0 | Not Implemented |
MI0085 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $263 | $102 | Implemented |
UU0061 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,895 | $18,633 | Not Implemented |
UU0061 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $267 | $1,000 | Not Implemented |
UU0061 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $274 | $0 | Implemented |
UU0061 # 04 Y:2004 | 04 | 2004 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $18,030 | $11,000 | Not Implemented |
UU0061 # 05 Y:2004 | 05 | 2004 | CONTRACT OUT MAINTENANCE | $15,000 | $2,000 | Not Implemented |
UU0061 # 06 Y:2004 | 06 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $351 | $432 | Implemented |
UU0059 # 01 Y:2004 | 01 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,130 | $9,651 | Not Implemented |
UU0059 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $20,658 | $20,658 | Implemented |
UU0059 # 03 Y:2004 | 03 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $23,500 | $15,630 | Not Implemented |