IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

201

matching recommendations
Reset
NAICS 33639 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0740 # 04 Y:2006 04 2006 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $45,101 $17,030 Not Implemented
UD0740 # 05 Y:2006 05 2006 USE PHOTOCELL CONTROLS $42,737 $0 Implemented
UD0740 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,847 $52,400 Not Implemented
UD0740 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,352 $2,280 Implemented
UD0740 # 08 Y:2006 08 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,428 $10,000 Not Implemented
UD0740 # 09 Y:2006 09 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,096 $0 Implemented
UD0740 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,805 $1,500 Implemented
UD0740 # 11 Y:2006 11 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,326 $1,700 Implemented
UD0740 # 12 Y:2006 12 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,280 $0 Implemented
UD0740 # 13 Y:2006 13 2006 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $223 $0 Implemented
UD0725 # 01 Y:2005 01 2005 RECOVER AND REUSE WASTE MATERIAL $45,000 $50,000 Not Implemented
UD0725 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,989 $792 Not Implemented
UD0725 # 03 Y:2005 03 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,863 $28,350 Implemented
UD0725 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,772 $18,444 Implemented
UD0725 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,315 $1,320 Implemented
UD0725 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $4,269 $3,192 Not Implemented
UD0725 # 07 Y:2005 07 2005 OPTIMIZE PLANT POWER FACTOR $3,254 $10,800 Not Implemented
UD0725 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $1,968 $0 Implemented
UD0725 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $1,788 $728 Implemented
UD0725 # 10 Y:2005 10 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $632 $1,170 Not Implemented
UD0725 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $564 $296 Not Implemented
UM0287 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $208,751 $887,900 Not Implemented
UM0287 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,506 $675 Implemented
UM0287 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $17,467 $1,200 Implemented
UM0287 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,493 $8,770 Implemented