Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73
matching recommendationsNAICS | 33639 | Other Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0343 # 04 Y:2023 | 04 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $8,146 | $1,330 | n/a |
MZ0343 # 09 Y:2023 | 09 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $175,679 | $545,812 | n/a |
MZ0343 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,303 | $5,150 | n/a |
MZ0343 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,711 | $360 | n/a |
MZ0343 # 08 Y:2023 | 08 | 2023 | OPTIMIZE PLANT POWER FACTOR | $126,570 | $196,842 | n/a |
MZ0343 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,510 | $9,100 | n/a |
MZ0343 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,575 | $28,807 | n/a |
MZ0343 # 07 Y:2023 | 07 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $52,726 | $2,400 | n/a |
MZ0343 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,951 | $31,059 | n/a |
MZ0324 # 06 Y:2021 | 06 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,010 | $664,200 | Not Implemented |
MZ0324 # 04 Y:2021 | 04 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,278 | $240 | Implemented |
MZ0324 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,050 | $7,800 | Implemented |
MZ0324 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,260 | $480 | Implemented |
MZ0324 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $269 | $340 | Implemented |
MZ0324 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,182 | $17,137 | Not Implemented |
MZ0292 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $460 | $1,000 | Implemented |
MZ0292 # 12 Y:2020 | 12 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $99,528 | $502,000 | Implemented |
MZ0292 # 08 Y:2020 | 08 | 2020 | USE PHOTOCELL CONTROLS | $43 | $73 | Implemented |
MZ0292 # 07 Y:2020 | 07 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,874 | $22,200 | Not Implemented |
MZ0292 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,704 | $59,378 | Not Implemented |
MZ0292 # 05 Y:2020 | 05 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $130 | $50 | Implemented |
MZ0292 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,892 | $4,700 | Not Implemented |
MZ0292 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,098 | $5,000 | Implemented |
MZ0292 # 10 Y:2020 | 10 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,760 | $45,300 | Not Implemented |
MZ0292 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,645 | $29,820 | Implemented |