IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
NAICS 33639 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0314 # 01 Y:2006 01 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $62,424 $69,750 Not Implemented
UM0314 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,296 $7,000 Not Implemented
UM0314 # 02 Y:2006 02 2006 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $30,865 $25,000 Not Implemented
UM0314 # 03 Y:2006 03 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $12,963 $2,480 Implemented
UM0314 # 09 Y:2006 09 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $133 $175 Not Implemented
UM0314 # 07 Y:2006 07 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,953 $3,286 Not Implemented
UM0314 # 08 Y:2006 08 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $596 $660 Not Implemented
UM0314 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,136 $3,084 Not Implemented
UM0314 # 06 Y:2006 06 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,473 $400 Implemented
NC0347 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $95 $165 Not Implemented
NC0347 # 05 Y:2006 05 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,239 $5,000 Not Implemented
NC0347 # 04 Y:2006 04 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,125 $22,000 Implemented
NC0347 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,895 $3,400 Implemented
NC0347 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,347 $100 Implemented
NC0347 # 01 Y:2006 01 2006 DEVELOP A REPAIR/REPLACE POLICY $6,708 $0 Implemented
NC0347 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,060 $5,000 Implemented
NC0347 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $269 $283 Implemented
IA0392 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $657 $1,300 Not Implemented
IA0392 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,514 $1,650 Implemented
IA0392 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,268 $2,268 Implemented
IA0392 # 05 Y:2006 05 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,308 $735 Implemented
IA0392 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $1,893 $3,850 Not Implemented
IA0392 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,749 $7,994 Implemented
IA0392 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,511 $66,554 Implemented
IA0392 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,713 $40,358 Implemented