IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 33639 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0069 # 10 Y:2011 10 2011 INSTALL OCCUPANCY SENSORS $596 $398 Not Implemented
UA0069 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,126 $1,300 Not Implemented
UA0069 # 08 Y:2011 08 2011 USE OPTIMUM THICKNESS INSULATION $6,558 $7,600 Not Implemented
UA0069 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,023 $800 Not Implemented
UA0069 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $678 $2,578 Not Implemented
UA0069 # 07 Y:2011 07 2011 USE OPTIMUM THICKNESS INSULATION $5,314 $1,750 Not Implemented
UA0069 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,441 $800 Not Implemented
UA0069 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,865 $24,690 Implemented
UA0069 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,916 $3,200 Not Implemented
UA0069 # 06 Y:2011 06 2011 USE OPTIMUM THICKNESS INSULATION $25,829 $16,900 Not Implemented
UA3016 # 01 Y:2011 01 2011 BURN WOOD BY-PRODUCTS FOR HEAT $19,294 $53,500 Not Implemented
UA3016 # 02 Y:2011 02 2011 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $3,721 $3,550 Not Implemented
UA3016 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,180 $1,500 Implemented
UA3016 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,387 $2,291 Not Implemented
UA3016 # 05 Y:2011 05 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,784 $2,000 Not Implemented
IA0473 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $615 $1,273 Implemented
IA0473 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,472 $426 Not Implemented
IA0473 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $4,669 Implemented
IA0473 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,500 $105 Implemented
IA0473 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $695 $1,100 Not Implemented
IA0473 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $954 Not Implemented
GT0882 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,117 $155,150 Implemented
GT0882 # 08 Y:2011 08 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $85,358 $222,000 Not Implemented
GT0882 # 03 Y:2011 03 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,143 $70,000 Not Implemented
GT0882 # 02 Y:2011 02 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,201 $0 Not Implemented