IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

524

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2315 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,175 $24,588 Implemented
KS2315 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $4,028 $6,350 Implemented
KS2315 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,991 $5,960 Implemented
KS2315 # 02 Y:2023 02 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $33,086 $235,752 Implemented
IP0167 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,565 $8,140 Implemented
IP0167 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,801 $3,457 Implemented
IP0167 # 04 Y:2022 04 2022 AIR CONDITION ONLY SPACE NECESSARY $6,333 $2,520 Implemented
IP0167 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,573 $475 Implemented
IP0167 # 09 Y:2022 09 2022 OPTIMIZE PLANT POWER FACTOR $11,341 $26,639 Implemented
UL2217 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,163 $19,500 Implemented
UL2217 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $32,626 $94,199 Implemented
UL2217 # 06 Y:2022 06 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,602 $50,000 Implemented
UL2217 # 10 Y:2022 10 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,146 $30,000 Implemented
UL2217 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,426 $0 Implemented
UL2217 # 09 Y:2022 09 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $33,279 $0 Implemented
MU0020 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,404 $5,949 Implemented
MU0020 # 10 Y:2022 10 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $210,000 $0 Implemented
MU0020 # 02 Y:2022 02 2022 USE OPTIMUM TEMPERATURE $226,577 $176,800 Implemented
KS2207 # 04 Y:2022 04 2022 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,371 $2,138 Implemented
KS2207 # 06 Y:2022 06 2022 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,202 $0 Implemented
KS2207 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,721 $18,007 Implemented
KS2207 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $28,812 $1,600 Implemented
MU0010 # 02 Y:2022 02 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,866 $16,000 Implemented
MU0010 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $842 $2,452 Implemented
MU0010 # 01 Y:2022 01 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,187 $13,999 Implemented