IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

524

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0239 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,993 $2,238 Implemented
UA0239 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,194 $50 Implemented
SU0502 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $275 $402 Implemented
SU0502 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $177 $244 Implemented
SU0502 # 02 Y:2021 02 2021 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,847 $93 Implemented
UU0176 # 07 Y:2021 07 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,411 $5,700 Implemented
UU0176 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,766 $7,600 Implemented
UU0176 # 03 Y:2021 03 2021 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $29,753 $10,400 Implemented
UU0176 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $94,747 $42,608 Implemented
MZ0292 # 13 Y:2020 13 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,837 $450 Implemented
MZ0292 # 12 Y:2020 12 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $99,528 $502,000 Implemented
MZ0292 # 09 Y:2020 09 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,588 $240 Implemented
MZ0292 # 08 Y:2020 08 2020 USE PHOTOCELL CONTROLS $43 $73 Implemented
MZ0292 # 05 Y:2020 05 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $130 $50 Implemented
MZ0292 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,098 $5,000 Implemented
MZ0292 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $460 $1,000 Implemented
MZ0292 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,645 $29,820 Implemented
UU0170 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $676 $440 Implemented
UU0170 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $150 Implemented
UU0170 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $13,868 $2,000 Implemented
UU0170 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,825 $21,841 Implemented
MI0375 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,712 $2,100 Implemented
MI0375 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,932 $4,843 Implemented
MI0375 # 06 Y:2020 06 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $939 $280 Implemented
MI0375 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $617 $1,522 Implemented