IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0392 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,087 $7,610 Not Implemented
BD0392 # 03 Y:2011 03 2011 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $6,856 $55,000 Implemented
BD0392 # 02 Y:2011 02 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $20,276 $73,000 Not Implemented
BD0392 # 01 Y:2011 01 2011 USE RADIANT HEATER FOR SPOT HEATING $9,888 $5,500 Not Implemented
BD0360 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,740 $2,700 Implemented
BD0360 # 08 Y:2009 08 2009 MODIFY STARTUP/SHUTDOWN TIMES $31,490 $2,000 Not Implemented
BD0360 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,624 $2,500 Not Implemented
BD0360 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,217 $4,200 Not Implemented
BD0360 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,394 $0 Not Implemented
BD0360 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,222 $1,000 Implemented
BD0360 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $1,709 $525 Not Implemented
BD0360 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,208 $20,180 Implemented
BD0360 # 09 Y:2009 09 2009 INSULATE BARE EQUIPMENT $2,040 $740 Not Implemented
IC0146 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,631 $729 Implemented
IC0146 # 03 Y:2008 03 2008 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $24,543 $208,785 Implemented
IC0146 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $548 $211 Implemented
IC0146 # 13 Y:2008 13 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,315 $0 Not Implemented
IC0146 # 12 Y:2008 12 2008 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $27,915 $32,868 Not Implemented
IC0146 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $487 $424 Implemented
IC0146 # 08 Y:2008 08 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $541 $0 Implemented
IC0146 # 02 Y:2008 02 2008 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,159 $0 Implemented
IC0146 # 01 Y:2008 01 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,678 $1,537 Not Implemented
IC0146 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $0 Not Implemented
IC0146 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,453 $0 Not Implemented
IC0146 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $1,535 $3,688 Implemented