IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

196

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0959 # 01 Y:2017 01 2017 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $114,753 $0 Not Implemented
UD0959 # 02 Y:2017 02 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $19,894 $39,000 Not Implemented
UD0959 # 03 Y:2017 03 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,841 $0 Not Implemented
UD0959 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,612 $68,240 Not Implemented
UD0959 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $14,215 $15,000 Not Implemented
UD0959 # 06 Y:2017 06 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,843 $0 Implemented
UD0959 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,881 $10,000 Implemented
UD0959 # 16 Y:2017 16 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,642 $41,348 Not Implemented
UD0959 # 15 Y:2017 15 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,991 $14,214 Implemented
UD0959 # 14 Y:2017 14 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,523 $139 Not Implemented
UD0959 # 13 Y:2017 13 2017 INSTALL OCCUPANCY SENSORS $14,374 $25,987 Not Implemented
UD0959 # 12 Y:2017 12 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,300 $0 Not Implemented
UD0959 # 11 Y:2017 11 2017 USE RADIANT HEATER FOR SPOT HEATING $6,411 $23,750 Not Implemented
UD0959 # 10 Y:2017 10 2017 REDUCE VENTILATION AIR $19,897 $10,500 Not Implemented
UD0959 # 09 Y:2017 09 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $78 $0 Implemented
UD0959 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,551 $1,000 Not Implemented
WV0500 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $516 $542 Implemented
WV0500 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,178 $4,647 Implemented
WV0500 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,981 $10,019 Implemented
WV0500 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,390 $11,630 Not Implemented
WV0500 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,477 $0 Implemented
WV0500 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,013 $20 Implemented
WV0500 # 04 Y:2015 04 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,650 $0 Not Implemented
UD0914 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,264 $5,000 Not Implemented
UD0914 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,381 $0 Implemented