Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
201
matching recommendationsNAICS | 336390 | Other Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0287 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,726 | $13,103 | Implemented |
UM0287 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $6,622 | $206 | Not Implemented |
UM0287 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,116 | $1,000 | Implemented |
UM0287 # 08 Y:2005 | 08 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,334 | $1,250 | Implemented |
UD0690 # 01 Y:2004 | 01 | 2004 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $24,929 | $9,930 | Not Implemented |
UD0690 # 02 Y:2004 | 02 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,916 | $9,244 | Not Implemented |
UD0690 # 03 Y:2004 | 03 | 2004 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,576 | $7,366 | Implemented |
UD0690 # 04 Y:2004 | 04 | 2004 | REDUCE FLUID FLOW RATES | $4,171 | $2,400 | Implemented |
UD0690 # 05 Y:2004 | 05 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,955 | $5,625 | Not Implemented |
UD0690 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,580 | $0 | Implemented |
UD0690 # 07 Y:2004 | 07 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,533 | $2,240 | Not Implemented |
UD0690 # 08 Y:2004 | 08 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,197 | $86 | Not Implemented |
UD0690 # 09 Y:2004 | 09 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,085 | $6 | Not Implemented |
UD0690 # 10 Y:2004 | 10 | 2004 | STANDARDIZE MOTOR INVENTORY | $952 | $340 | Not Implemented |
UD0690 # 11 Y:2004 | 11 | 2004 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $352 | $0 | Implemented |
UD0690 # 12 Y:2004 | 12 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $430 | $170 | Implemented |
UD0687 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,973 | $1,000 | Implemented |
UD0687 # 02 Y:2004 | 02 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,400 | $1,230 | Not Implemented |
UD0687 # 03 Y:2004 | 03 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,090 | $0 | Not Implemented |
UD0687 # 04 Y:2004 | 04 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,420 | $9,650 | Not Implemented |
UD0687 # 05 Y:2004 | 05 | 2004 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $2,740 | $540 | Not Implemented |
UD0687 # 06 Y:2004 | 06 | 2004 | DISCONNECT BALLASTS | $2,430 | $2,610 | Implemented |
UD0687 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,030 | $2,350 | Not Implemented |
UD0687 # 08 Y:2004 | 08 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $365 | $450 | Implemented |
UD0687 # 09 Y:2004 | 09 | 2004 | PAY BILLS ON TIME TO AVOID LATE FEES | $180 | $649 | Not Implemented |