Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 336390 | Other Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0375 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,932 | $4,843 | Implemented |
MI0375 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $339 | $984 | Implemented |
MI0375 # 07 Y:2020 | 07 | 2020 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $911 | $1,214 | Not Implemented |
MI0375 # 04 Y:2020 | 04 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,948 | $2,692 | Not Implemented |
MI0375 # 03 Y:2020 | 03 | 2020 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,971 | $965 | Not Implemented |
MI0375 # 06 Y:2020 | 06 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $939 | $280 | Implemented |
MI0375 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,712 | $2,100 | Implemented |
MI0375 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,722 | $20,153 | Implemented |
MI0375 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $617 | $1,522 | Implemented |
MI0297 # 07 Y:2016 | 07 | 2016 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $21,352 | $22,281 | Implemented |
MI0297 # 14 Y:2016 | 14 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $335 | $944 | Implemented |
MI0297 # 13 Y:2016 | 13 | 2016 | USE PHOTOCELL CONTROLS | $781 | $240 | Not Implemented |
MI0297 # 12 Y:2016 | 12 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,442 | $2,628 | Implemented |
MI0297 # 11 Y:2016 | 11 | 2016 | INSTALL OCCUPANCY SENSORS | $5,116 | $884 | Not Implemented |
MI0297 # 10 Y:2016 | 10 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,934 | $10,031 | Not Implemented |
MI0297 # 09 Y:2016 | 09 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,631 | $16,156 | Not Implemented |
MI0297 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,133 | $1,660 | Implemented |
MI0297 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,747 | $40 | Not Implemented |
MI0297 # 05 Y:2016 | 05 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,144 | $7,000 | Implemented |
MI0297 # 04 Y:2016 | 04 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $27,925 | $1,400 | Not Implemented |
MI0297 # 03 Y:2016 | 03 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $40,957 | $1,120 | Not Implemented |
MI0297 # 02 Y:2016 | 02 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $65,063 | $200,000 | Not Implemented |
MI0297 # 01 Y:2016 | 01 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $97,105 | $82,600 | Not Implemented |
MI0085 # 06 Y:2004 | 06 | 2004 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $20,000 | $0 | Not Implemented |
MI0085 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $-19 | $2,670 | Implemented |