IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

201

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1092 # 03 Y:2024 03 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,477 $5,670 n/a
UD1092 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $26,516 $0 n/a
UD1092 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,291 $0 n/a
UD1092 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,052 $34,302 n/a
UD1092 # 02 Y:2024 02 2024 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,755 $0 n/a
UL2217 # 10 Y:2022 10 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,146 $30,000 Implemented
UL2217 # 09 Y:2022 09 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $33,279 $0 Implemented
UL2217 # 06 Y:2022 06 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,602 $50,000 Implemented
UL2217 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,163 $19,500 Implemented
UL2217 # 02 Y:2022 02 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,739 $7,251 Not Implemented
UL2217 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,426 $0 Implemented
UL2217 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,769 $4,795 Not Implemented
UL2217 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $32,626 $94,199 Implemented
UL2217 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $6,919 $102,018 Not Implemented
UL2217 # 08 Y:2022 08 2022 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $6,524 $25,900 Not Implemented
UL2214 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,187 $1,760 Not Implemented
UL2214 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $67,238 $1,046,392 Not Implemented
UL2214 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $43,721 $432,345 Not Implemented
UL2214 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $626 $3,993 Not Implemented
UL2214 # 07 Y:2022 07 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $612 $0 Not Implemented
UL2214 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,475 $0 Not Implemented
UL2214 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,543 $0 Not Implemented
UD1030 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,553 $21,607 Implemented
UD1030 # 06 Y:2021 06 2021 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,833 $4,000 Not Implemented
UD1030 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,340 $0 Implemented