Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsNAICS | 336390 | Other Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0109 # 02 Y:2005 | 02 | 2005 | INSTALL WASTE HEAT BOILER TO PRODUCE STEAM | $437,212 | $3,259,200 | Not Implemented |
IC0109 # 03 Y:2005 | 03 | 2005 | REPLACE BOILER | $294,938 | $501,372 | Not Implemented |
IC0109 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,632 | $22,464 | Not Implemented |
IC0109 # 05 Y:2005 | 05 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $1,239 | $400 | Implemented |
IC0109 # 06 Y:2005 | 06 | 2005 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $37,809 | $131,160 | Not Implemented |
IC0109 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $36,496 | $2,100 | Implemented |
IC0109 # 01 Y:2005 | 01 | 2005 | MODIFY WORKLOAD | $25,000 | $0 | Implemented |
UD0725 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $4,269 | $3,192 | Not Implemented |
UD0725 # 01 Y:2005 | 01 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $45,000 | $50,000 | Not Implemented |
UD0725 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,989 | $792 | Not Implemented |
UD0725 # 03 Y:2005 | 03 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,863 | $28,350 | Implemented |
UD0725 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,772 | $18,444 | Implemented |
UD0725 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,315 | $1,320 | Implemented |
UD0725 # 07 Y:2005 | 07 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,254 | $10,800 | Not Implemented |
UD0725 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $1,968 | $0 | Implemented |
UD0725 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $1,788 | $728 | Implemented |
UD0725 # 10 Y:2005 | 10 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $632 | $1,170 | Not Implemented |
UD0725 # 11 Y:2005 | 11 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $564 | $296 | Not Implemented |
UM0287 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,467 | $1,200 | Implemented |
UM0287 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $6,622 | $206 | Not Implemented |
UM0287 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,726 | $13,103 | Implemented |
UM0287 # 04 Y:2005 | 04 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,493 | $8,770 | Implemented |
UM0287 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,116 | $1,000 | Implemented |
UM0287 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,506 | $675 | Implemented |
UM0287 # 01 Y:2005 | 01 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $208,751 | $887,900 | Not Implemented |