IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

688

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0319 # 01 Y:2007 01 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,538 $875 Implemented
BD0319 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,763 $0 Implemented
TA0131 # 01 Y:2006 01 2006 UPGRADE CONTROLS ON COMPRESSORS $18,180 $16 Implemented
TA0131 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,450 $120 Implemented
TA0131 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,400 $0 Implemented
OR0512 # 01 Y:2006 01 2006 INSTALL OCCUPANCY SENSORS $100,600 $5,500 Implemented
OR0512 # 03 Y:2006 03 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,000 $5,000 Implemented
OR0512 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,300 $5,000 Implemented
OR0512 # 05 Y:2006 05 2006 UPGRADE CONTROLS ON COMPRESSORS $4,400 $7,500 Implemented
MS0301 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $17,310 $21,720 Implemented
MS0301 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,625 $30,484 Implemented
MS0301 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,037 $21,914 Implemented
MS0301 # 05 Y:2006 05 2006 BURN WASTE OIL FOR HEAT $1,477 $2,186 Implemented
MS0301 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $244 Implemented
OK0734 # 02 Y:2006 02 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $33,532 $47,764 Implemented
OK0734 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,323 $5,175 Implemented
OK0734 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $3,000 $500 Implemented
AS0416 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,872 $34,827 Implemented
AS0416 # 03 Y:2006 03 2006 $3,096 $0 Implemented
UF0371 # 01 Y:2005 01 2005 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,120 $978 Implemented
UF0371 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,368 $650 Implemented
UF0371 # 03 Y:2005 03 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,271 $1,680 Implemented
UF0371 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,453 $675 Implemented
UF0371 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,424 $0 Implemented
UF0371 # 08 Y:2005 08 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,385 $0 Implemented