IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0120 # 01 Y:2021 01 2021 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $30,000 $70,084 Implemented
UD0998 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,189 $3,500 Not Implemented
UD0998 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,128 $0 Not Implemented
UD0998 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,093 $0 Not Implemented
UD0998 # 03 Y:2019 03 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $10,815 $2,500 Not Implemented
UD0998 # 04 Y:2019 04 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,888 $40 Not Implemented
UD0998 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $965 $280 Not Implemented
UD0998 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,380 $1,315 Not Implemented
UD0998 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,135 $5,000 Not Implemented
UD0998 # 09 Y:2019 09 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,344 $2,520 Not Implemented
UD0939 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,169 $0 Implemented
UD0939 # 02 Y:2016 02 2016 COMBINE UTILITY METERS $10,737 $0 Not Implemented
UD0939 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $1,588 $1,013 Implemented
UD0939 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $164 $375 Implemented
UD0939 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,740 $1,000 Implemented
UD0939 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $4,358 $400 Not Implemented
UD0939 # 03 Y:2016 03 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $369 $700 Not Implemented
UD0939 # 08 Y:2016 08 2016 INSTALL SPECTRAL REFLECTORS / DELAMP $1,699 $315 Implemented
UD0939 # 09 Y:2016 09 2016 COVER OPEN TANKS $1,526 $740 Not Implemented
UD0939 # 10 Y:2016 10 2016 COVER OPEN TANKS $612 $600 Not Implemented
UD0939 # 11 Y:2016 11 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,321 $6,500 Not Implemented
UD0715 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $531 $0 Implemented
UD0715 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,689 $0 Not Implemented
UD0715 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,021 $0 Implemented
UD0715 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,402 $100 Implemented