Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
211
matching recommendationsNAICS | 3364 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0389 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,739 | $33,655 | Implemented |
MI0389 # 04 Y:2021 | 04 | 2021 | INSTALL EFFICIENT RECTIFIERS | $21,196 | $55,920 | Implemented |
MI0389 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,025 | $120 | Implemented |
MI0389 # 10 Y:2021 | 10 | 2021 | COMBINE UTILITY METERS | $776 | $240 | Not Implemented |
MI0389 # 09 Y:2021 | 09 | 2021 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,362 | $616 | Implemented |
MI0389 # 08 Y:2021 | 08 | 2021 | USE COMPRESSOR AIR FILTERS | $1,420 | $1,100 | Implemented |
MI0389 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,000 | $480 | Not Implemented |
MI0389 # 06 Y:2021 | 06 | 2021 | INSULATE BARE EQUIPMENT | $15,421 | $6,812 | Not Implemented |
MI0384 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $69,936 | $480 | Implemented |
MI0384 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,477 | $8,668 | Implemented |
MI0384 # 07 Y:2020 | 07 | 2020 | PAY UTILITY BILLS ON TIME | $1,659 | $0 | Implemented |
MI0384 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,572 | $1,980 | Implemented |
MI0384 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,610 | $2,100 | Implemented |
MI0384 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,546 | $3,927 | Implemented |
MI0384 # 03 Y:2020 | 03 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $4,404 | $16,320 | Implemented |
MI0384 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO HEAT WATER | $26,710 | $12,200 | Not Implemented |
MI0382 # 06 Y:2020 | 06 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,088 | $1,306 | Not Implemented |
MI0382 # 04 Y:2020 | 04 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,045 | $1,796 | Not Implemented |
MI0382 # 03 Y:2020 | 03 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $5,430 | $2,740 | Not Implemented |
MI0382 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO HEAT WATER | $7,209 | $8,409 | Not Implemented |
MI0382 # 01 Y:2020 | 01 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,223 | $3,645 | Not Implemented |
MI0382 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,278 | $3,204 | Implemented |
MI0382 # 07 Y:2020 | 07 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $964 | $1,884 | Implemented |
MI0381 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,688 | $4,905 | Implemented |
MI0381 # 01 Y:2020 | 01 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $23,304 | $57,960 | Not Implemented |