IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,605

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0715 # 04 Y:2005 04 2005 REPAIR AND ELIMINATE STEAM LEAKS $2,597 $500 Implemented
UD0715 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,021 $0 Implemented
UD0715 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,689 $0 Not Implemented
UD0715 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $781 $340 Implemented
UD0715 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $781 $130 Not Implemented
UD0715 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $531 $0 Implemented
AS0395 # 01 Y:2005 01 2005 UPGRADE CONTROLS ON COMPRESSORS $5,134 $10,000 Implemented
AS0395 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,439 $1,000 Implemented
AS0395 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $429 $1,950 Implemented
AS0395 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $872 $800 Implemented
AS0395 # 05 Y:2005 05 2005 USE SOLAR HEAT TO HEAT WATER $1,228 $1,100 Not Implemented
AS0395 # 06 Y:2005 06 2005 USE A DIFFERENT OR RECYCLED RAW MATERIAL $7,600 $380 Not Implemented
UM0278 # 01 Y:2005 01 2005 COVER OPEN TANKS $33,962 $480 Implemented
UM0278 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,116 $2,200 Implemented
UM0278 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,140 $3,000 Not Implemented
UM0278 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $618 $184 Implemented
UM0278 # 05 Y:2005 05 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $333 $850 Not Implemented
UF0354 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,587 $63,488 Implemented
UF0354 # 02 Y:2004 02 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $19,414 $0 Implemented
UF0354 # 03 Y:2004 03 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,795 $62,620 Not Implemented
UF0354 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,169 $745 Not Implemented
UF0354 # 05 Y:2004 05 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $7,962 $31,000 Implemented
UF0354 # 06 Y:2004 06 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,140 $779 Not Implemented
UF0354 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,543 $0 Implemented
UF0354 # 08 Y:2004 08 2004 ADD AREA LIGHTING SWITCHES $2,354 $11,495 Not Implemented