Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 3364 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0154 # 07 Y:2021 | 07 | 2021 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $893 | $710 | Not Implemented |
BS0154 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $679 | $280 | Not Implemented |
BS0154 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,750 | $3,231 | Not Implemented |
BS0154 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,232 | $320 | Not Implemented |
BS0154 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $766 | $25 | Not Implemented |
BS0154 # 05 Y:2021 | 05 | 2021 | ADOPT IN-HOUSE MATERIAL GENERATION | $182,277 | $204,462 | Not Implemented |
BS0154 # 06 Y:2021 | 06 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,288 | $6,000 | Not Implemented |
BS0041 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,789 | $8,520 | Not Implemented |
BS0041 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $1,000 | $180 | Not Implemented |
BS0041 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $988 | $5,580 | Not Implemented |
BS0041 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $156 | $480 | Not Implemented |
BS0041 # 05 Y:2014 | 05 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,010 | $3,900 | Not Implemented |
BS0041 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,476 | $15 | Not Implemented |
BS0041 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $398 | $722 | Not Implemented |
BS0041 # 08 Y:2014 | 08 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $930 | $285 | Not Implemented |
BS0041 # 09 Y:2014 | 09 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $118 | $292 | Not Implemented |
BS0041 # 10 Y:2014 | 10 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,324 | $15,600 | Not Implemented |
BS0041 # 11 Y:2014 | 11 | 2014 | INSULATE BARE EQUIPMENT | $436 | $1,128 | Not Implemented |
BS0022 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,989 | $218 | Implemented |
BS0022 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $871 | $15 | Implemented |
BS0022 # 05 Y:2013 | 05 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $1,748 | $697 | Implemented |
BS0022 # 04 Y:2013 | 04 | 2013 | COVER OPEN TANKS | $418 | $310 | Not Implemented |
BS0022 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,022 | $26,934 | Not Implemented |
BS0022 # 01 Y:2013 | 01 | 2013 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $3,444 | $500 | Implemented |
OR0466 # 01 Y:2004 | 01 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,000 | $21,000 | Implemented |