IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

723

matching recommendations
Reset
NAICS 33641 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0005 # 03 Y:2017 03 2017 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $258,000 $292,000 Implemented
TR0005 # 04 Y:2017 04 2017 METER WASTE WATER $11,708 $2,650 Implemented
TR0005 # 05 Y:2017 05 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,338 $56,000 Implemented
TR0005 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,836 $8,821 Implemented
TR0005 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $223 $399 Implemented
TR0005 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $287 $494 Implemented
TR0005 # 10 Y:2017 10 2017 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $8,320 $966 Implemented
TR0005 # 11 Y:2017 11 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,882 $25,954 Implemented
SD0556 # 01 Y:2017 01 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $57,756 $205,000 Implemented
SD0556 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,198 $27,633 Implemented
SD0556 # 05 Y:2017 05 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,046 $53,400 Implemented
SD0556 # 06 Y:2017 06 2017 COVER OPEN TANKS $18,591 $10,800 Implemented
SD0556 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,514 $21,100 Implemented
SD0556 # 11 Y:2017 11 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,718 $1,300 Implemented
SD0556 # 12 Y:2017 12 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,902 $200 Implemented
MA0781 # 04 Y:2017 04 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,734 $2,724 Implemented
MA0781 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $285 $215 Implemented
MA0779 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $3,249 $100 Implemented
MA0779 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $213 $200 Implemented
OK0962 # 01 Y:2017 01 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,242 $3,615 Implemented
OK0962 # 03 Y:2017 03 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $600 $160 Implemented
OK0962 # 04 Y:2017 04 2017 INSTALL SET-BACK TIMERS $378 $599 Implemented
OK0962 # 05 Y:2017 05 2017 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $311 $480 Implemented
OK0962 # 09 Y:2017 09 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $712 $2,381 Implemented
OK0962 # 10 Y:2017 10 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $1,180 Implemented