Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsNAICS | 33641 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1066 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $671 | $1,639 | Implemented |
UD1066 # 02 Y:2023 | 02 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,630 | $1,415 | Implemented |
UD1066 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,952 | $600 | Implemented |
CW0120 # 06 Y:2021 | 06 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $899 | $0 | Implemented |
CW0120 # 08 Y:2021 | 08 | 2021 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $217 | $86 | Implemented |
CW0120 # 07 Y:2021 | 07 | 2021 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000,000 | $122,000 | Implemented |
CW0120 # 05 Y:2021 | 05 | 2021 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,965 | $510 | Implemented |
CW0120 # 04 Y:2021 | 04 | 2021 | MODIFY STARTUP/SHUTDOWN TIMES | $2,380 | $100,000 | Implemented |
CW0120 # 03 Y:2021 | 03 | 2021 | USE BATTERY STORAGE FOR DEMAND CONTROL | $18,089 | $25,885 | Implemented |
CW0120 # 02 Y:2021 | 02 | 2021 | INSTALL BACK-UP EQUIPMENT | $32,054 | $93,000 | Implemented |
CW0120 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $30,000 | $70,084 | Implemented |
UD0939 # 01 Y:2016 | 01 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,169 | $0 | Implemented |
UD0939 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,740 | $1,000 | Implemented |
UD0939 # 06 Y:2016 | 06 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $164 | $375 | Implemented |
UD0939 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $1,588 | $1,013 | Implemented |
UD0939 # 08 Y:2016 | 08 | 2016 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,699 | $315 | Implemented |
UD0715 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,797 | $53,464 | Implemented |
UD0715 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $531 | $0 | Implemented |
UD0715 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $781 | $340 | Implemented |
UD0715 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,021 | $0 | Implemented |
UD0715 # 04 Y:2005 | 04 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $2,597 | $500 | Implemented |
UD0715 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,402 | $100 | Implemented |