IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,621

matching recommendations
Reset
NAICS 33641 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0276 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,492 $8,838 Not Implemented
MS0276 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,547 $15,656 Not Implemented
MS0276 # 06 Y:2005 06 2005 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,712 $1,848 Not Implemented
MS0276 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,158 $1,871 Implemented
MS0276 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $398 $478 Not Implemented
GT0806 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $22,100 $2,782 Not Implemented
GT0806 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $2,150 Implemented
GT0806 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,900 $52,200 Not Implemented
GT0806 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,300 $23,431 Not Implemented
GT0806 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,600 $2,613 Not Implemented
GT0806 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,900 $135,800 Not Implemented
GT0806 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,000 $59,670 Not Implemented
GT0806 # 08 Y:2005 08 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,300 $13,870 Not Implemented
UD0715 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,797 $53,464 Implemented
UD0715 # 02 Y:2005 02 2005 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $21,170 $62,500 Not Implemented
UD0715 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,402 $100 Implemented
UD0715 # 04 Y:2005 04 2005 REPAIR AND ELIMINATE STEAM LEAKS $2,597 $500 Implemented
UD0715 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,021 $0 Implemented
UD0715 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,689 $0 Not Implemented
UD0715 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $781 $340 Implemented
UD0715 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $781 $130 Not Implemented
UD0715 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $531 $0 Implemented
AS0395 # 01 Y:2005 01 2005 UPGRADE CONTROLS ON COMPRESSORS $5,134 $10,000 Implemented
AS0395 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,439 $1,000 Implemented
AS0395 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $429 $1,950 Implemented