Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,719
matching recommendationsNAICS | 33641 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0060 # 04 Y:2004 | 04 | 2004 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,047 | $2,600 | Not Implemented |
UU0060 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $309 | $723 | Not Implemented |
UU0060 # 06 Y:2004 | 06 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,853 | $0 | Not Implemented |
UU0060 # 07 Y:2004 | 07 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,897 | $200 | Implemented |
CO0542 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,390 | $600 | Implemented |
CO0542 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,300 | $1,860 | Implemented |
CO0542 # 03 Y:2004 | 03 | 2004 | USE SOLAR HEAT TO HEAT WATER | $970 | $3,780 | Not Implemented |
CO0542 # 04 Y:2004 | 04 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $530 | $250 | Implemented |
CO0542 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,380 | $52,440 | Implemented |
CO0542 # 06 Y:2004 | 06 | 2004 | USE PHOTOCELL CONTROLS | $4,900 | $18,630 | Implemented |
AS0375 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,472 | $11,485 | Not Implemented |
AS0375 # 02 Y:2004 | 02 | 2004 | INSTALL OCCUPANCY SENSORS | $880 | $900 | Not Implemented |
AS0375 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,797 | $26,415 | Not Implemented |
AS0375 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $468 | $737 | Implemented |
AS0375 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $168 | $60 | Implemented |
AS0375 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,132 | $30 | Implemented |
TA0066 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $29,101 | $28,080 | Implemented |
TA0066 # 02 Y:2003 | 02 | 2003 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $2,218 | $0 | Implemented |
TA0066 # 03 Y:2003 | 03 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,854 | $0 | Implemented |
TA0066 # 04 Y:2003 | 04 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,240 | $3,740 | Not Implemented |
TA0066 # 05 Y:2003 | 05 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $893 | $0 | Implemented |
TA0066 # 06 Y:2003 | 06 | 2003 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $630 | $210 | Not Implemented |
TA0066 # 07 Y:2003 | 07 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $668 | $0 | Implemented |
TA0066 # 08 Y:2003 | 08 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $557 | $0 | Not Implemented |
TA0066 # 09 Y:2003 | 09 | 2003 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $184 | $270 | Not Implemented |