IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 33641 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0604 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,606 $3,300 Not Implemented
NC0604 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $452 $1,000 Not Implemented
NC0604 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $311 $200 Not Implemented
NC0604 # 04 Y:2017 04 2017 DEVELOP A REPAIR/REPLACE POLICY $505 $2,577 Not Implemented
NC0485 # 08 Y:2013 08 2013 RECOVER WASTE HEAT FROM EQUIPMENT $22,938 $75,000 Not Implemented
NC0485 # 07 Y:2013 07 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $148,178 $100,000 Not Implemented
NC0485 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,809 $100 Implemented
NC0485 # 05 Y:2013 05 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,936 $300 Not Implemented
NC0485 # 04 Y:2013 04 2013 REPAIR OR REPLACE STEAM TRAPS $167,046 $6,100 Implemented
NC0485 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $2,647 $3,750 Implemented
NC0485 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $2,016 $7,315 Implemented
NC0485 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,649 $108,665 Implemented
NC0354 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,936 $2,559 Implemented
NC0354 # 07 Y:2007 07 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,714 $1,000 Not Implemented
NC0354 # 06 Y:2007 06 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $7,411 $2,000 Implemented
NC0354 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,375 $100 Implemented
NC0354 # 04 Y:2007 04 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $35,076 $2,000 Not Implemented
NC0354 # 03 Y:2007 03 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $65,972 $100,000 Not Implemented
NC0354 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $32,774 $100,000 Not Implemented
NC0354 # 01 Y:2007 01 2007 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $39,874 $45,600 Not Implemented