Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 33641 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0422 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,451 | $4,146 | Implemented |
SD0422 # 04 Y:2009 | 04 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,765 | $2,554 | Not Implemented |
SD0422 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,840 | $2,200 | Implemented |
SD0422 # 02 Y:2009 | 02 | 2009 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,480 | $0 | Implemented |
SD0422 # 01 Y:2009 | 01 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $31,588 | $0 | Implemented |
WV0394 # 11 Y:2009 | 11 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,448 | $619 | Implemented |
WV0394 # 06 Y:2009 | 06 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,269 | $600 | Implemented |
WV0394 # 05 Y:2009 | 05 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,870 | $8,495 | Not Implemented |
WV0394 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,978 | $19,253 | Implemented |
WV0394 # 03 Y:2009 | 03 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,052 | $63,760 | Not Implemented |
WV0394 # 02 Y:2009 | 02 | 2009 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $22,727 | $50,200 | Implemented |
WV0394 # 01 Y:2009 | 01 | 2009 | CONVERT TO OXYFUEL BURNERS | $81,984 | $49,000 | Not Implemented |
WV0394 # 14 Y:2009 | 14 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $764 | $480 | Not Implemented |
WV0394 # 13 Y:2009 | 13 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $998 | $0 | Implemented |
WV0394 # 12 Y:2009 | 12 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,118 | $1,017 | Not Implemented |
WV0394 # 15 Y:2009 | 15 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $335 | $158 | Implemented |
WV0394 # 07 Y:2009 | 07 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,911 | $4,500 | Not Implemented |
WV0394 # 08 Y:2009 | 08 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $3,395 | $678 | Implemented |
WV0394 # 10 Y:2009 | 10 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,627 | $6,370 | Not Implemented |
WV0394 # 09 Y:2009 | 09 | 2009 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,940 | $1,000 | Implemented |
GT0863 # 03 Y:2009 | 03 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $194,835 | $180,000 | Not Implemented |
GT0863 # 04 Y:2009 | 04 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $316,142 | $180,000 | Not Implemented |
GT0863 # 05 Y:2009 | 05 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $107,962 | $125,000 | Not Implemented |
GT0863 # 02 Y:2009 | 02 | 2009 | APPLY FOR INVESTMENT INCENTIVES | $24,150 | $0 | Not Implemented |
GT0863 # 01 Y:2009 | 01 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $3,847 | $500 | Not Implemented |