Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
237
matching recommendationsNAICS | 336411 | Aircraft Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0416 # 01 Y:2006 | 01 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,751 | $36,000 | Not Implemented |
AS0416 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,872 | $34,827 | Implemented |
AS0416 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,096 | $0 | Implemented |
AS0416 # 04 Y:2006 | 04 | 2006 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,237 | $0 | Not Implemented |
AS0416 # 05 Y:2006 | 05 | 2006 | USE SOLAR HEAT TO HEAT WATER | $345 | $2,050 | Not Implemented |
UF0371 # 01 Y:2005 | 01 | 2005 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $6,120 | $978 | Implemented |
UF0371 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,368 | $650 | Implemented |
UF0371 # 03 Y:2005 | 03 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $6,271 | $1,680 | Implemented |
UF0371 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,453 | $675 | Implemented |
UF0371 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $2,952 | $4,688 | Not Implemented |
UF0371 # 06 Y:2005 | 06 | 2005 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,254 | $20,000 | Not Implemented |
UF0371 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,424 | $0 | Implemented |
UF0371 # 08 Y:2005 | 08 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,385 | $0 | Implemented |
UF0371 # 09 Y:2005 | 09 | 2005 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $5,477 | $800 | Implemented |
UF0371 # 10 Y:2005 | 10 | 2005 | REDESIGN PROCESS | $61,200 | $1,000,000 | Not Implemented |
UF0371 # 11 Y:2005 | 11 | 2005 | IMPROVE SPACE COMFORT CONDITIONING | $1,596 | $26,800 | Implemented |
UF0371 # 12 Y:2005 | 12 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $100,000 | $25,000 | Implemented |
UF0371 # 13 Y:2005 | 13 | 2005 | IMPROVE SPACE COMFORT CONDITIONING | $100,000 | $50,000 | Implemented |
OR0488 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $600 | $200 | Implemented |
OR0488 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $680 | $2,000 | Not Implemented |
OR0488 # 03 Y:2005 | 03 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $28,100 | $132,000 | Implemented |
UF0354 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,587 | $63,488 | Implemented |
UF0354 # 02 Y:2004 | 02 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $19,414 | $0 | Implemented |
UF0354 # 03 Y:2004 | 03 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,795 | $62,620 | Not Implemented |
UF0354 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,169 | $745 | Not Implemented |