Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
441
matching recommendationsNAICS | 336413 | Other Aircraft Parts and Auxiliary Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0822 # 08 Y:2012 | 08 | 2012 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $16,463 | $26,358 | Implemented |
OK0822 # 09 Y:2012 | 09 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,814 | $40,395 | Implemented |
DL0079 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,495 | $36,850 | Implemented |
DL0079 # 03 Y:2011 | 03 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,737 | $100 | Implemented |
DL0079 # 04 Y:2011 | 04 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,364 | $1,015 | Implemented |
DL0079 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,317 | $350 | Implemented |
DL0079 # 08 Y:2011 | 08 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $464 | $105 | Implemented |
NC0436 # 03 Y:2011 | 03 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,076 | $4,000 | Implemented |
NC0436 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,560 | $100 | Implemented |
NC0436 # 06 Y:2011 | 06 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $12,954 | $6,435 | Implemented |
NC0436 # 08 Y:2011 | 08 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,009 | $1,000 | Implemented |
WV0420 # 03 Y:2011 | 03 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,569 | $14,510 | Implemented |
WV0420 # 04 Y:2011 | 04 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,500 | $4,500 | Implemented |
WV0420 # 05 Y:2011 | 05 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $764 | $480 | Implemented |
MI0194 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $63,336 | $80,304 | Implemented |
MI0194 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,923 | $1,210 | Implemented |
MI0194 # 06 Y:2010 | 06 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,190 | $2,000 | Implemented |
MI0189 # 02 Y:2010 | 02 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,451 | $2,000 | Implemented |
MI0189 # 03 Y:2010 | 03 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,033 | $10,500 | Implemented |
MI0189 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,161 | $7,164 | Implemented |
MI0189 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,029 | $1,210 | Implemented |
MS0367 # 01 Y:2010 | 01 | 2010 | COVER OPEN TANKS | $79,614 | $15,421 | Implemented |
OK0790 # 03 Y:2010 | 03 | 2010 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $32,076 | $0 | Implemented |
OK0790 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,871 | $1,750 | Implemented |
OK0790 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,627 | $20,203 | Implemented |