Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
78
matching recommendationsNAICS | 336413 | Other Aircraft Parts and Auxiliary Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0880 # 08 Y:2014 | 08 | 2014 | INSULATE BARE EQUIPMENT | $6,439 | $6,993 | Not Implemented |
OK0880 # 09 Y:2014 | 09 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,385 | $3,468 | Not Implemented |
OK0880 # 10 Y:2014 | 10 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $78 | $376 | Not Implemented |
OK0790 # 07 Y:2010 | 07 | 2010 | OPTIMIZE PLANT POWER FACTOR | $3,031 | $11,550 | Not Implemented |
OK0790 # 01 Y:2010 | 01 | 2010 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $22,023 | $495,980 | Not Implemented |
OK0790 # 02 Y:2010 | 02 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,353 | $30,200 | Not Implemented |
OK0790 # 03 Y:2010 | 03 | 2010 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $32,076 | $0 | Implemented |
OK0790 # 04 Y:2010 | 04 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,083 | $4,638 | Not Implemented |
OK0790 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,871 | $1,750 | Implemented |
OK0790 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $810 | $0 | Not Implemented |
OK0790 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,627 | $20,203 | Implemented |
OK0790 # 09 Y:2010 | 09 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,084 | $9,806 | Not Implemented |
OK0790 # 10 Y:2010 | 10 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $245 | $13 | Implemented |
OK0790 # 11 Y:2010 | 11 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $334 | $418 | Implemented |
OK0741 # 05 Y:2007 | 05 | 2007 | INSTALL SET-BACK TIMERS | $273 | $248 | Not Implemented |
OK0741 # 04 Y:2007 | 04 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,042 | $6,800 | Not Implemented |
OK0741 # 03 Y:2007 | 03 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,334 | $7,480 | Not Implemented |
OK0741 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,666 | $860 | Not Implemented |
OK0741 # 01 Y:2007 | 01 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $144,120 | $500,000 | Not Implemented |
OK0672 # 02 Y:2003 | 02 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $28,340 | $0 | Not Implemented |
OK0672 # 03 Y:2003 | 03 | 2003 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $12,626 | $2,000 | Implemented |
OK0672 # 04 Y:2003 | 04 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,333 | $145 | Not Implemented |
OK0672 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,041 | $0 | Not Implemented |
OK0672 # 06 Y:2003 | 06 | 2003 | OPTIMIZE PLANT POWER FACTOR | $1,292 | $8,190 | Not Implemented |
OK0672 # 07 Y:2003 | 07 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,225 | $262 | Implemented |