Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
154
matching recommendationsNAICS | 336413 | Other Aircraft Parts and Auxiliary Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0531 # 04 Y:2016 | 04 | 2016 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,855 | $6,757 | Not Implemented |
SD0531 # 05 Y:2016 | 05 | 2016 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,169 | $11,200 | Not Implemented |
SD0531 # 06 Y:2016 | 06 | 2016 | USE PHOTOCELL CONTROLS | $2,137 | $4,625 | Not Implemented |
SD0531 # 07 Y:2016 | 07 | 2016 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,177 | $305 | Not Implemented |
SD0531 # 08 Y:2016 | 08 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,145 | $850 | Not Implemented |
SD0528 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $117,397 | $321,940 | Not Implemented |
SD0528 # 02 Y:2016 | 02 | 2016 | REDUCE SCRAP PRODUCTION | $22,801 | $25,619 | Not Implemented |
SD0528 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,641 | $1,700 | Implemented |
SD0528 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,638 | $43,142 | Implemented |
SD0528 # 05 Y:2016 | 05 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $8,651 | $1,032 | Not Implemented |
SD0528 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,000 | $200 | Not Implemented |
SD0528 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,400 | $1,300 | Not Implemented |
SD0528 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $4,725 | $7,800 | Not Implemented |
SD0528 # 09 Y:2016 | 09 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,286 | $4,076 | Not Implemented |
SD0528 # 10 Y:2016 | 10 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,512 | $200 | Not Implemented |
SD0528 # 11 Y:2016 | 11 | 2016 | USE PHOTOCELL CONTROLS | $157 | $185 | Not Implemented |
SD0486 # 01 Y:2014 | 01 | 2014 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $75,586 | $286,300 | Not Implemented |
SD0486 # 02 Y:2014 | 02 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $54,581 | $250,000 | Not Implemented |
SD0486 # 03 Y:2014 | 03 | 2014 | REDUCE SCRAP PRODUCTION | $29,967 | $30,993 | Not Implemented |
SD0486 # 04 Y:2014 | 04 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,957 | $4,985 | Not Implemented |
SD0486 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,274 | $22,000 | Not Implemented |
SD0486 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,270 | $600 | Not Implemented |
SD0486 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $600 | Not Implemented |
SD0479 # 01 Y:2014 | 01 | 2014 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $360,753 | $1,272,000 | Not Implemented |
SD0479 # 02 Y:2014 | 02 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $67,610 | $30,440 | Not Implemented |