Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsNAICS | 336413 | Other Aircraft Parts and Auxiliary Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1066 # 02 Y:2023 | 02 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,630 | $1,415 | Implemented |
UD1066 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,718 | $952 | Not Implemented |
UD1066 # 08 Y:2023 | 08 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5 | $0 | Not Implemented |
UD1066 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,952 | $600 | Implemented |
UD1066 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $671 | $1,639 | Implemented |
UD1066 # 06 Y:2023 | 06 | 2023 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $21,383 | $42,766 | Not Implemented |
UD1066 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,743 | $18,195 | Not Implemented |
UD1066 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,566 | $1,770 | Not Implemented |
CW0120 # 02 Y:2021 | 02 | 2021 | INSTALL BACK-UP EQUIPMENT | $32,054 | $93,000 | Implemented |
CW0120 # 08 Y:2021 | 08 | 2021 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $217 | $86 | Implemented |
CW0120 # 07 Y:2021 | 07 | 2021 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000,000 | $122,000 | Implemented |
CW0120 # 06 Y:2021 | 06 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $899 | $0 | Implemented |
CW0120 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $30,000 | $70,084 | Implemented |
CW0120 # 03 Y:2021 | 03 | 2021 | USE BATTERY STORAGE FOR DEMAND CONTROL | $18,089 | $25,885 | Implemented |
CW0120 # 05 Y:2021 | 05 | 2021 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,965 | $510 | Implemented |
CW0120 # 04 Y:2021 | 04 | 2021 | MODIFY STARTUP/SHUTDOWN TIMES | $2,380 | $100,000 | Implemented |
UD0939 # 09 Y:2016 | 09 | 2016 | COVER OPEN TANKS | $1,526 | $740 | Not Implemented |
UD0939 # 01 Y:2016 | 01 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,169 | $0 | Implemented |
UD0939 # 02 Y:2016 | 02 | 2016 | COMBINE UTILITY METERS | $10,737 | $0 | Not Implemented |
UD0939 # 03 Y:2016 | 03 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $369 | $700 | Not Implemented |
UD0939 # 08 Y:2016 | 08 | 2016 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,699 | $315 | Implemented |
UD0939 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,740 | $1,000 | Implemented |
UD0939 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,358 | $400 | Not Implemented |
UD0939 # 06 Y:2016 | 06 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $164 | $375 | Implemented |
UD0939 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $1,588 | $1,013 | Implemented |