IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 336419 Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0498 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,979 $18,397 Not Implemented
SU0498 # 07 Y:2020 07 2020 USE PHOTOCELL CONTROLS $380 $615 Not Implemented
SU0498 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $323 $427 Not Implemented
SU0498 # 05 Y:2020 05 2020 DISCONNECT BALLASTS $81 $30 Not Implemented
SU0498 # 04 Y:2020 04 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $346 $85 Not Implemented
SU0498 # 03 Y:2020 03 2020 ELIMINATE/REDUCE AN OPERATION $22,525 $4,900 Not Implemented
SU0498 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $325 $60 Not Implemented
SU0498 # 01 Y:2020 01 2020 REDUCE VENTILATION AIR $6,925 $882 Not Implemented
UW0054 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $3,619 $2,700 Not Implemented
UW0054 # 02 Y:2011 02 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,537 $50,000 Not Implemented
UW0054 # 01 Y:2011 01 2011 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $25,410 $190,516 Not Implemented
BD0319 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $403 $475 Not Implemented
BD0319 # 01 Y:2007 01 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,538 $875 Implemented
BD0319 # 03 Y:2007 03 2007 USE PHOTOCELL CONTROLS $328 $250 Not Implemented
BD0319 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,763 $0 Implemented
BD0319 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $876 $500 Not Implemented
BD0319 # 06 Y:2007 06 2007 MINIMIZE WATER USAGE $1,153 $2,800 Not Implemented
LM0102 # 04 Y:2005 04 2005 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $450,000 $15,000 Not Implemented
LM0102 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,202 $500 Implemented
LM0102 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,058 $1,000 Implemented
LM0102 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,712 $200 Implemented
LM0102 # 05 Y:2005 05 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,258,000 $1,250,000 Implemented
MS0276 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $32,940 $298 Not Implemented
MS0276 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $64,043 $8,505 Not Implemented
MS0276 # 08 Y:2005 08 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $398 $478 Not Implemented