Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
148
matching recommendationsNAICS | 3365 | Railroad Rolling Stock Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0518 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,361 | $21,950 | Implemented |
WV0518 # 08 Y:2016 | 08 | 2016 | INSULATE BARE EQUIPMENT | $5,682 | $3,428 | Implemented |
WV0518 # 09 Y:2016 | 09 | 2016 | INSTALL OCCUPANCY SENSORS | $2,986 | $510 | Implemented |
WV0518 # 10 Y:2016 | 10 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $2,441 | $1,398 | Not Implemented |
WV0518 # 11 Y:2016 | 11 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,011 | $128 | Implemented |
WV0518 # 12 Y:2016 | 12 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $556 | $2,428 | Implemented |
BS0036 # 01 Y:2014 | 01 | 2014 | USE OPTIMUM THICKNESS INSULATION | $17,744 | $26,100 | Not Implemented |
BS0036 # 02 Y:2014 | 02 | 2014 | INSTALL REPLACEMENT DOORS | $4,556 | $17,436 | Not Implemented |
BS0036 # 03 Y:2014 | 03 | 2014 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $16,582 | $31,134 | Not Implemented |
BS0036 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,961 | $10,130 | Not Implemented |
BS0036 # 05 Y:2014 | 05 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,250 | $11,371 | Not Implemented |
BS0036 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,963 | $937 | Implemented |
BS0036 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,898 | $2,032 | Implemented |
MZ0129 # 01 Y:2013 | 01 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $56,550 | $18,200 | Implemented |
MZ0129 # 02 Y:2013 | 02 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $31,447 | $13,600 | Not Implemented |
MZ0129 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,082 | $1,800 | Implemented |
MZ0129 # 04 Y:2013 | 04 | 2013 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,563 | $760 | Implemented |
MZ0129 # 05 Y:2013 | 05 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,763 | $63,637 | Implemented |
MZ0129 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $156 | $0 | Not Implemented |
MZ0129 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,580 | $267,500 | Implemented |
MZ0129 # 08 Y:2013 | 08 | 2013 | INSTALL OCCUPANCY SENSORS | $998 | $190 | Implemented |
MZ0129 # 09 Y:2013 | 09 | 2013 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $31,162 | $150,000 | Not Implemented |
MZ0129 # 10 Y:2013 | 10 | 2013 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,959 | $600 | Not Implemented |
MZ0129 # 11 Y:2013 | 11 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,450 | $0 | Implemented |
WV0451 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,277 | $41,953 | Not Implemented |