Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 33661 | Ship and Boat Building |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0531 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $84,178 | $47,500 | Not Implemented |
LE0531 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $330,596 | $199,875 | Not Implemented |
LE0531 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $49,409 | $33,000 | Not Implemented |
LE0531 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,036 | $10,414 | Not Implemented |
LE0531 # 06 Y:2022 | 06 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $88,444 | $135,000 | Not Implemented |
LE0531 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $130,874 | $22,000 | Not Implemented |
MZ0306 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,350 | $30,500 | Not Implemented |
MZ0306 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,283 | $9,100 | Not Implemented |
MZ0306 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $640 | $160 | Not Implemented |
MZ0306 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,459 | $17,421 | Not Implemented |
MZ0306 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $247 | $870 | Implemented |
MZ0306 # 02 Y:2022 | 02 | 2022 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $4,781 | $18,650 | Not Implemented |
MZ0306 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,617 | $50,190 | Not Implemented |
MZ0327 # 01 Y:2022 | 01 | 2022 | INSTALL OCCUPANCY SENSORS | $299 | $960 | Implemented |
MZ0327 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,999 | $25,044 | Not Implemented |
MZ0327 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,903 | $17,890 | Implemented |
MZ0327 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,801 | $6,385 | Not Implemented |
MZ0327 # 04 Y:2022 | 04 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $61,626 | $574,750 | Not Implemented |
MZ0327 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,649 | $16,300 | Not Implemented |
MZ0327 # 02 Y:2022 | 02 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,637 | $25,442 | Implemented |
TT0270 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,877 | $2,770 | Implemented |
TT0270 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,525 | $50 | Implemented |
TT0270 # 07 Y:2022 | 07 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $881 | $1,200 | Not Implemented |
TT0270 # 05 Y:2022 | 05 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,201 | $2,240 | Not Implemented |
TT0270 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,829 | $40 | Not Implemented |