Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
NAICS 3369 Other Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0016 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,081 $21,876 Not Implemented
IP0016 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $708 $1,622 Not Implemented
IP0016 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,271 $1,400 Implemented
IP0016 # 09 Y:2013 09 2013 INSTALL OCCUPANCY SENSORS $301 $490 Not Implemented
TT0106 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $8,613 $37,637 Not Implemented
TT0106 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,063 $720 Implemented
TT0106 # 03 Y:2013 03 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $1,763 $5,520 Not Implemented
TT0106 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $2,586 $9,280 Not Implemented
OK0843 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,582 $3,116 Implemented
OK0843 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,466 $0 Implemented
OK0843 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,402 $1,000 Implemented
OK0843 # 04 Y:2013 04 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $950 $1,309 Not Implemented
OK0843 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $413 $875 Not Implemented
OK0843 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,261 $20,748 Implemented
OK0843 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,864 $7,326 Implemented
OK0843 # 08 Y:2013 08 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,735 $3,900 Not Implemented
OK0843 # 09 Y:2013 09 2013 INSTALL SET-BACK TIMERS $709 $1,288 Not Implemented
OK0843 # 10 Y:2013 10 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $704 $280 Not Implemented
OK0843 # 11 Y:2013 11 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,107 $3,900 Not Implemented
OK0843 # 12 Y:2013 12 2013 INSULATE BARE EQUIPMENT $263 $768 Not Implemented
OK0843 # 13 Y:2013 13 2013 OPTIMIZE PLANT POWER FACTOR $3,539 $11,638 Not Implemented
UA0089 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $7,437 $680 Implemented
UA0089 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,625 $200 Implemented
UA0089 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,506 $1,550 Not Implemented
UA0089 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,674 $51,251 Not Implemented