Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsNAICS | 3371 | Household and Institutional Furniture and Kitchen Cabinet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0483 # 01 Y:2014 | 01 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,026 | $61,400 | Implemented |
SD0483 # 07 Y:2014 | 07 | 2014 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $783 | $500 | Implemented |
SD0483 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,147 | $500 | Implemented |
SD0483 # 05 Y:2014 | 05 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,563 | $3,243 | Implemented |
SD0483 # 03 Y:2014 | 03 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,486 | $2,845 | Implemented |
SD0483 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,633 | $2,600 | Implemented |
SD0374 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,927 | $7,500 | Implemented |
SD0374 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,769 | $140 | Implemented |
SD0374 # 04 Y:2005 | 04 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,982 | $220 | Implemented |
SD0374 # 06 Y:2005 | 06 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $688 | $350 | Implemented |
SD0374 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,046 | $52,243 | Implemented |
SF0302 # 08 Y:2005 | 08 | 2005 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $1,200 | $0 | Implemented |
SF0302 # 07 Y:2005 | 07 | 2005 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $1,800 | $250 | Implemented |
SF0302 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $600 | $2,584 | Implemented |
SF0302 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $474 | $1,638 | Implemented |
SF0302 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $496 | $0 | Implemented |
LM0089 # 05 Y:2005 | 05 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $26,400 | $0 | Implemented |
LM0089 # 06 Y:2005 | 06 | 2005 | MODIFY MATERIAL APPLICATION METHODS | $7,090 | $800 | Implemented |
LM0089 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,671 | $380 | Implemented |
SF0291 # 03 Y:2004 | 03 | 2004 | ADD AREA LIGHTING SWITCHES | $9,569 | $1,464 | Implemented |
SF0291 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $914 | $3,294 | Implemented |
SF0291 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,732 | $78,810 | Implemented |
SF0291 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,810 | $5,675 | Implemented |
SF0291 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,113 | $720 | Implemented |
LM0073 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,649 | $0 | Implemented |