IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

966

matching recommendations
Reset
NAICS 3371 Household and Institutional Furniture and Kitchen Cabinet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0310 # 01 Y:2005 01 2005 $167,500 $150,000 Implemented
NC0310 # 02 Y:2005 02 2005 $97,500 $61,250 Implemented
NC0310 # 03 Y:2005 03 2005 $60,000 $20,500 Implemented
NC0310 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $509 $100 Implemented
NC0310 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $339 $616 Not Implemented
NC0310 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,830 $875 Implemented
NC0310 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,451 $3,000 Implemented
NC0310 # 04 Y:2005 04 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,863 $30,000 Not Implemented
LE0206 # 01 Y:2005 01 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $135,669 $50,000 Not Implemented
LE0206 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,193 $5,000 Implemented
LE0206 # 03 Y:2005 03 2005 $11,880 $14,100 Implemented
LE0206 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,905 $2,500 Not Implemented
LE0206 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,894 $2,200 Not Implemented
LE0206 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $200 Implemented
LE0206 # 07 Y:2005 07 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $63,361 $382,500 Not Implemented
LM0089 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,671 $380 Implemented
LM0089 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $163 $0 Not Implemented
LM0089 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,655 $4,550 Not Implemented
LM0089 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $368 $150 Not Implemented
LM0089 # 05 Y:2005 05 2005 $26,400 $0 Implemented
LM0089 # 06 Y:2005 06 2005 MODIFY MATERIAL APPLICATION METHODS $7,090 $800 Implemented
NC0307 # 01 Y:2004 01 2004 $151,225 $150,000 Not Implemented
NC0307 # 02 Y:2004 02 2004 $72,400 $49,500 Implemented
NC0307 # 03 Y:2004 03 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $32,361 $24,000 Not Implemented
NC0307 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $16,989 $31,278 Not Implemented